Three Phase Distribution Transformer FAQ 1

Mar. 16, 2023

Share:

1. For three phase distribution transformer that has been stopped for a long time, it is necessary to measure the insulation resistance and do the oil withstand voltage test before it is put into operation again_____ (C)

A. One month B. Three months C. Half a year D. One year

2. After adjusting the tap changer, measure its contact resistance, the difference between three times should not exceed ______ (A)

A, 2% B, 2.5% C, 3% D, 5%

3. For a three phase distribution transformer newly put into operation, the time required for no-load operation is _______ (C)

A, 8h B, 16h C, 24h D, 48h

4. For transformers in motion, the time limit for preventive tests is ________ (B)

A. Half a year B. One to three years C. Two years D. Five years

5. When three phase distribution transformer is in normal operation, the neutral line current should not exceed the ________ of the corresponding line current (C)

A, 15% B, 20% C, 25% D, 30%

6. The three phase distribution transformer will generate operating overvoltage under the following conditions ________ (C)

A. Closing B. Closing C. Closing and closing D. Misoperation

7. The basis for judging whether a three phase distribution transformer is overloaded is ________ (D)

A. Active power B. Reactive power C. Voltage D. Current

8. The direct grounding resistance value of the neutral wire of the transformer low-voltage winding is ________ (A)

A, 4Ω B, 5Ω C, 10Ω D, 30Ω

9. The maximum capacity of the three phase distribution transformer installed on the pole is ________ (C)

A, 160kVA B, 250kVA C, 315kVA D, 500kVA

10. The transformer current breaks quickly and the overcurrent protection operates, and the circuit breaker should issue a ________ (C) after tripping

A. Instantaneous forecast signal B. Delayed forecast signal C. Accident signal D. No signal

Contact Us

Contact us. Together with us, inspire boundless creativity

CONTACT US

Tel: +86 312 5880165

Mob: +86 135 1322 2010

Fax: +86 312 5880165

E-mail: gracejia@zydqjt.com

Skype: +86 135 1322 2010

WhatsApp: +86 135 1322 2010

Wechat: +86 135 1322 2010

FOLLOW US

Add: Room A1109, No.483 Yulan Street, Baoding City, Hebei Province, China

Copyright © Baoding Zhongyi Electrical material Manufacturing Co., Ltd. All Rights Reserved | Sitemap

Powered by